Another 6 dump truck loads of dirt have been added to the south end of the hang 2/3 runway, to fill the rocky riverbed, at the transition up to the hang 4 lz.

It's much wider and safer than it was last weekend.

The plan is to slowly widen the entire wash runway on the west side, covering all of the boulders. Obviously this is going to take some time, and lots of dirt.
Safety is a book, not a word
Michael Robertson
addicted2climbing
Posts: 182
Joined: Mon Aug 20, 2007 9:50 pm

Post by addicted2climbing »

Hello Joe,

Thank you from all H2's like myself.. I'ts nice to be able to get back out and fly and that the LZ is open again to H2's. Wish I were able to help on projects like these but my work schedule has been a bit crazy. Hopefully I will be able to lend a hand in future LZ repair..

See you tomorrow!

Marc
greblo
Posts: 464
Joined: Wed Jan 18, 2006 11:22 am

Post by greblo »

Another 12 dump truck loads of dirt have been added to the end of the H2 runway. It get's better every week.