The Pavillion roof is moving forward very well with Tom, his son and volunteers. Both Darrel and I have been installing the hardware but need help, I have limited time, and show up when I can. Its easy and fun work once you get going, like a over sized Lincoln Log set plus you get to use power tools. So if you can spare time please come by. 2 full days with one person would complete all the hardware it would go much faster with 2 people. This would really help Tom because the hardware has to be done before he can start finishing the tong and groove roofing.
Lets keep this project moving the end is near.
Pavillion Hardware help
Moderator: Chip
- skygeek AKA Seabass
- Posts: 252
- Joined: Thu Dec 21, 2006 9:34 pm
- Location: Newhall
- Contact:
- skygeek AKA Seabass
- Posts: 252
- Joined: Thu Dec 21, 2006 9:34 pm
- Location: Newhall
- Contact:
90% of hardware was completed today by myself and one of my employees, we would have finished but materials ran out, the remainder will be completed tomorrow. Lorin came out to fly but it blew down so he spent a great deal of time cleaning up around the work site. Thanks Lorin. Tom and Darryl continued on the roof. The three smaller roofs are going much faster than the large one. Tomorrow blocking will go in and then the Tong and grove will start to go in.
Thanks to all who volunteer. But we can always use more help now that the retaining walls will be starting soon.
Thanks to all who volunteer. But we can always use more help now that the retaining walls will be starting soon.